Infrastructure, Parking & Traffic Reports

  1. 675 Main Street-Community Health Center Expansion Parking Study, 2009 (PDF)
  2. Advisability Report for Construction of Marine Terminal at Middletown, Connecticut, 1968 (PDF)
  3. Arrigoni Bridge- Bridge Lighting, 2011 (PDF)
  4. Bank of America County Lane Parking Lot, 2012 (PDF)
  5. City Dock, 1998 (PDF)
  6. Community Facilities Plan, 1978 (PDF)
  7. Community Facilities Plan, 1979 (PDF)
  8. Community Facilities Plan, 1980 (PDF)
  9. Community Facilities Plan, 1981 (PDF)
  10. Complete Streets Priority Commuter Map, 2013 (PDF)
  11. Complete Streets Priority List, 2013 (PDF)
  12. Complete Streets Priority Map, 2013 (PDF)
  13. Complete Streets Priority Recreation Map, 2013 (PDF)
  14. Complete Streets Priority School Areas Map, 2013 (PDF)
  15. Complete Streets Taskforce- Final Report, 2013 (PDF)
  16. Connecticut Department of Transportation Middletown Average Daily Trip Counts Map, 2004 (PDF)
  17. Connecticut Department of Transportation Middletown Average Daily Trip Counts Map, 2007 (PDF)
  18. Connecticut Department of Transportation Middletown Average Daily Trip Counts Map, 2010 (PDF)
  19. Connecticut Department of Transportation Route 9 Changes Presentation Handout, 2014 (PDF)
  20. Connecticut Freight Railroad Map, 2007 (PDF)
  21. Connecticut Rail Depot Taskforce Report, 1996 (PDF)
  22. Connecticut River Boat Launching Facility, 1982 (PDF)
  23. Connecticut River- Tranmission Crossing in Middletown, 1972 (PDF)
  24. Connecticut State Rail Plan, 2010 (PDF)
  25. Connecticut State Rail Plan, 2012 (PDF)
  26. Connecticut Valley Railroad TIGER Grant Application, 2009 (PDF)
  27. DeKoven Drive Extension- North of Washington Street, 1978 (PDF)
  28. Downtown Deck- Rocco Architects, 1998 (PDF)
  29. Downtown Parking and Traffic Study, 2007 (PDF)
  30. Downtown Parking Counts, 2006 (PDF)
  31. Downtown Parking Improvement Plan, 1958 (PDF)
  32. Downtown Parking Map, 1935 (PDF)
  33. Downtown Parking Program, 1971 (PDF)
  34. Downtown Parking Report, 2005 (PDF)
  35. Downtown Parking Study- Playhouse, 2003 (PDF)
  36. Downtown Parking Study, 1984 (PDF)
  37. Downtown Parking Survey Program, 1953 (PDF)
  38. Downtown Signage Study Report, 2010 (PDF)
  39. Downtown Traffic Study, 1989 (PDF)
  40. Hartford Middletown Branch Rail Line,2012 (PDF)
  41. Main Street Accessible Parking Survey, 2002 (PDF)
  42. Main Street Design Plan, 1975 (PDF)
  43. Map of Main Street, 1928 (PDF)
  44. Mattabassett District- Inter-Municipal Sewerage Feasibility, 1999 (PDF)
  45. Middletown and the Connecticut River_ A New Image- Plan for Waterfront Recreational Development (PDF)
  46. Middletown Area Crossing Study (Bridge Replacement Feasibility), 2008 (PDF)
  47. Middletown Community Facilities Plan, 1999 (PDF)
  48. Middletown High School- East Street Feasibility, 2001 (PDF)
  49. Middletown Rail Exploratory Committee, 1994 (PDF)
  50. Middletown Railroad Suspension Bridge, 1848 (PDF)
  51. Middletown School Building Needs, 1965 (PDF)
  52. Middletown Sewage Disposal, 1937 (PDF)
  53. Middletown Sewers and Intercepter- Plan B, 1931 (PDF)
  54. Middletown Survey of Off Street Parking, 1977 (PDF)
  55. Middletown Traffic Survey, 1935 (PDF)
  56. Middletown-Portland Bridge, 1938 (PDF)
  57. Middletowns Rail History and Potential, 2013 (PDF)
  58. Midstate Regional Planning Agency- Study of Refuse Disposal, 1965 (PDF)
  59. Midstate Regional Planning Agency- Study of Sanitary Sewage Disposal and Storm Water Control, 1965 (PDF)
  60. Midstate Regional Planning Agency- Study of Water Resources, 1965 (PDF)
  61. MidState Regional Planning Agency- Transit Development Program, 1978 (PDF)
  62. Multi-Use Downtown-Wesleyan Hills Trail, 2013 (PDF)
  63. Municipal Garage Condition Report, 1992 (PDF)
  64. North End Industrial Redevelopment Area- Traffic Analysis, 1993 (PDF)
  65. Proposed Bike Plan Map, 2011 (PDF)
  66. Proposed Waterfront Highway Concept, 1940s (PDF)
  67. Relocation of Route 6a (66) and Connecticut River Bridge Study, 1967 (PDF)
  68. Rendering of Railroad Suspension Bridge (GIF)
  69. Report on the Water System and the Sewage Disposal Plant of Middletown, Connecticut, 1946 (PDF)
  70. Rethinking Downtown Parking Requirements, 2008 (PDF)
  71. RiverCOG- Valley Railroad State Park Economic Feasibility Study, 2015 (PDF)
  72. Riverfront Renaissance Information Document, 2000 (PDF)
  73. Route 66 and Route 9 Corridor and Bridge Study, 1972 (PDF)
  74. Route 66- Reconstruction Environmental Assessment, 1996 (PDF)
  75. Route 9- North and South Interchange and Tunnel, 2003 (PDF)
  76. Route 9- Operational Improvement Study- Socio-Economic Analysis, 2002 (PDF)
  77. Route 9- Tunnel Feasibility Study, 2003 (PDF)
  78. Summary of Middletown Parking 1935-2013, 2013 (PDF)
  79. US Army Corporation- River Road Emergency Streambank Protection, 1987 (PDF)
  80. Wesleyan Downtown Connections Study, 2008 (PDF)
  81. Wesleyan Parking Management Plan, 2002 (PDF)